Available under Creative Commons-ShareAlike 4.0 International License.
The costs incurred as a result of a product failure before it is delivered to the customer. These can consist of rework costs, scrap cost, downtime, etc.
- 2508 reads
The costs incurred as a result of a product failure before it is delivered to the customer. These can consist of rework costs, scrap cost, downtime, etc.