You are here

Project design brief

1 December, 2015 - 10:07

The brief was given to the catering designer after wide consultation. It was divided into two parts, covering foodservice and general requirements.

Foodservice

  • The project design shall be based on the concepts produced by the consultants in conjunction with the bank and its catering company.
  • The cost of the foodservice equipment element of the budget shall be totally recoverable over a five-year period through reduced operating costs, brought about by increased efficiency as a result of the overall concept.
  • The aim shall be to provide catering facilities of a very high standard.
  • A wider choice of foods shall be made available.
  • Food shall be made available in bar areas.
  • Entertaining facilities for guests shall be provided.
  • The working conditions for catering staff shall generally be improved.

General

  • On completion of the contract, the building will be capable of a further 20 years of life under normal maintenance conditions.
  • Energy conservation will have utmost priority.
  • Environmental standards shall conform to the latest codes of practice.
  • The building shall comply with all current legislation.
  • Standby electrical facilities shall be maintained.
  • All finishes and installations shall be easily maintained.

To enable the design brief to be carried out the consultants were given several instructions:

  • Survey each floor and determine principal service risers and drops for possible structural alterations and effects on proposed layouts. Relate all services to building drawings for reference.
  • Survey each floor for possible structural alterations, particularly with regard to centralization of the dish-washing activities.
  • Propose a style of service for each floor.
  • Propose conceptual sketch layouts for each floor.
  • Prepare schedules of new equipment with budget costs.
  • Prepare schedule of building projects, together with budget costs.
  • Prepare schedule of services, together with budget costs.
  • Produce a report embodying all proposals, sketch layouts, budget costs, and schedules.