Available under Creative Commons-ShareAlike 4.0 International License.
The brief was given to the catering designer after wide consultation. It was divided into two parts, covering foodservice and general requirements.
Foodservice
- The project design shall be based on the concepts produced by the consultants in conjunction with the bank and its catering company.
- The cost of the foodservice equipment element of the budget shall be totally recoverable over a five-year period through reduced operating costs, brought about by increased efficiency as a result of the overall concept.
- The aim shall be to provide catering facilities of a very high standard.
- A wider choice of foods shall be made available.
- Food shall be made available in bar areas.
- Entertaining facilities for guests shall be provided.
- The working conditions for catering staff shall generally be improved.
General
- On completion of the contract, the building will be capable of a further 20 years of life under normal maintenance conditions.
- Energy conservation will have utmost priority.
- Environmental standards shall conform to the latest codes of practice.
- The building shall comply with all current legislation.
- Standby electrical facilities shall be maintained.
- All finishes and installations shall be easily maintained.
To enable the design brief to be carried out the consultants were given several instructions:
- Survey each floor and determine principal service risers and drops for possible structural alterations and effects on proposed layouts. Relate all services to building drawings for reference.
- Survey each floor for possible structural alterations, particularly with regard to centralization of the dish-washing activities.
- Propose a style of service for each floor.
- Propose conceptual sketch layouts for each floor.
- Prepare schedules of new equipment with budget costs.
- Prepare schedule of building projects, together with budget costs.
- Prepare schedule of services, together with budget costs.
- Produce a report embodying all proposals, sketch layouts, budget costs, and schedules.
- 1128 reads